- IMO
- 1019905
- MMSI
- 710007318
- Call Sign
- PU8725
Technical Specifications
Key Figures
Live Tracking
Current Position
Where it waited most
Most time stopped at Rio De Janeiro — 3 d across 3 stays.
- 1Rio De Janeiro3 d · 3×
- 2Dtse / Gegua Oil Terminal42 h · 2×
- 3Niteroi7 h · 3×
Derived from the AIS track — runs of near-zero speed (anchored, moored or drifting) snapped to the nearest port. Builds up as we observe the vessel.
Intelligence
Risk & Sustainability
- Rio De Janeiro2.5 dJun 29, 2026
- Rio De Janeiro0.3 dJun 28, 2026
- Dtse / Gegua Oil Terminal1.5 dJun 20, 2026
- Rio De Janeiro0.2 dJun 20, 2026
- Dtse / Gegua Oil Terminal0.6 dJun 19, 2026
AIS-derived from our live feed.
Operational Status
Activity
Stopped, anchored or moored on its latest broadcast — parked, not necessarily withdrawn.
Read from the single most-recent AIS broadcast we hold for this hull — we keep no position history, so this is a point-in-time posture, not a dwell inference. Derived in-house from our own AIS feed; weight it by the broadcast age above.
Port calls
1 recent · AIS-detectedArrivals, time in port and the load/discharge inferred from the draught change — detected from AIS track history. An open call means the vessel is still in port (no departure observed yet).
- op. unknownIn port since
Method: each call is a run of fixes inside a port’s geofence confirmed by a stop (or an AIS gap); load/discharge is the sign of the draught delta over the call. Indicative — arrivals before our AIS history began read from the first observation.
Composite Risk
Risk Score
No strong adverse signal on the components we could read for this hull.
A coverage-weighted blend of the 2 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. This headline is flagged low-confidence (a thin or structural-only read) and should not be treated as a verdict. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Capacity & Classification
Other · summer draught 5.85 m · 14.7 t per cm immersion
Estimate only — modelled from deadweight (deadweight only) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Voyage Estimate
Explore More
Similar Vessels
Community
Vessel Comments